Plant room monthly walk

Plant rooms fail quietly. A monthly walk with readings per unit catches the leaking pump, the tripped fan and the tank lid left off before they become a callout. Each unit in the room is its own asset, so the reading lands on the pump, not on the room.

4 sections, 17 items

1Access and environment

  1. Plant room confirmed from the QR label *

    Yes / no
  2. Door locks, signage in place, no unauthorised storage *

    Pass / fail
  3. Lighting works, floor dry, drains clear *

    Pass / fail
  4. Room temperature (°C)

    Number

2Heating and pumps

  1. Boilers firing, no fault codes, flue joints sound *

    Pass / fail
  2. System pressure (bar) *

    Number
  3. Pumps running without noise or vibration, no leaks at glands or flanges *

    Pass / fail
  4. Pressurisation unit and expansion vessels within range

    Pass / fail

3Ventilation and water

  1. AHU filters clean or within change interval; belts tensioned; no unusual noise *

    Pass / fail
  2. Cold water storage tank lid fitted and sealed, insulation intact *

    Pass / fail
  3. Cold water storage temperature (°C)

    Number
  4. Calorifier flow temperature (°C)

    Number

4Electrical and sign-off

  1. Panels closed, no warning lights, no signs of overheating or tripped breakers *

    Pass / fail
  2. Emergency lighting and extinguisher in the room checked

    Pass / fail
  3. Defects found

    Text
  4. Photo of any defect

    Photo
  5. Engineer signature *

    Signature

* Required

Import it, tag one asset, run the check

Your first asset is free, with no card. The checklist comes with you.

Start free Request a demo